Infrastructure was one of the central issues. Existing tracks are shared with freight trains. So neither option could operate reliably on that network ...
Infrastructure was one of the central issues. Existing tracks are shared with freight trains. So neither option could operate reliably on that network ...
Right at the centre of that intersection are the tracks that carry trains along the Barrie Line for GO Transit. Metrolinx has “significant concerns” ...