City gives up on Centre Line LRT bridge over river, for now
The city had determined that in its current condition, the High Level Bridge doesn't have the structural capacity to carry an additional load of LRT trains.
The city had determined that in its current condition, the High Level Bridge doesn't have the structural capacity to carry an additional load of LRT trains.
'Rail rationalization' would remove 47 street-level rail crossings ... assistant superintendent with Canadian Pacific for three decades, ending in 2016.
AMLO's foreign minister-designate Marcelo Ebrard said that a delegation of Canadian officials last month expressed interest in participating in the rail ...
allow sufficient time for vehicles to clear the rail crossing;; prevent vehicles ... Denis@tc.gc.ca; Media Relations, Transport Canada, Ottawa, 613-993- ...
MONT-SAINT-HILAIRE, QC, Aug. 14, 2018 /CNW/ - With over 40,000 kilometres of track, the rail system connects Canadians by moving people and ...